The work for this task should be produced using Word drawing facilities. The forward and backward passes should

INSTRUCTIONS TO CANDIDATES
ANSWER ALL QUESTIONS

Using and managing data and information

Task A

A carpet shop specialises in selling six types of fine carpets named simply as “Iranian”, “Algerian”, “Turkish”, “Peruvian”, “Uzbek” and “Malian”.

The shop wants you to create an Excel sales table consisting of the following entries:

They want to data-validate as a list the cell presented in green above.

The number of carpets (N° of units) to be sold should be data-validated as a number that does not exceed TWO. The price (£) should be retrieved from the following table using an XLOOKUP formula.

Required:

 π‘‡π‘œπ‘‘π‘Žπ‘™ = 𝑁° π‘œπ‘“ 𝑒𝑛𝑖𝑑𝑠 π‘ π‘œπ‘™π‘‘ × π‘ƒπ‘Ÿπ‘–π‘π‘’ 

Produce an Excel worksheet showing how you will progress the above project. You need to show useful screenshots and formulae for all the activities and give how your table retrieves the price for the “Peruvian” carpet. You should insert all your work on a single WORD page. 

Task B

An airline company surveyed its passengers regarding their experience through the airport. In particular, they wanted to examine the level of their satisfaction and the time taken to get through the airport.

The satisfaction level is measured using scores from 0=Not at all satisfied to 60=Very satisfied.

The time through the airport was measured by giving each passenger a card once they arrive at the airport to be returned to an agent once they reach the departure lounge and the time measured in minutes.

Required

1. Produce a frequency and percentage frequency tables for each of the following variables:

Age

Type (of travel)

2. Draw a bar chart representing the variable “Age”.

3. Calculate the descriptive statistics (Location and spread) for the variable “Satisfaction”. The descriptive should include the minimum, maximum, both quartiles, mean, median, variance, standard deviation, range and inter-quartile range.

Please note that the statistics should be presented correct to a whole number but the mean and standard deviation should be presented correct to the nearest 1 decimal place.

4. Draw a box plot for the variable “Satisfaction” split by “Class” of travel.

5. Draw a scatter diagram of the “satisfaction” score against “time” taken, calculate the correlation coefficient and show the linear regression equation in context (not in x and y). 

Task C

A builder contacted you for a project management work in order to plan a medium scale building project. He knew all the different activities of the job, their precedence and their average durations which he shared with you. They are shown on the table below

Required:

1. Draw a network diagram and conduct the forward and backward pass.

2. State the duration of this project and the critical path.

3. Explain, without doing any calculation, what would happen to the project if the actual duration of activity A is two weeks. No more than 20 words.

Note:

The work for this task should be produced using Word drawing facilities. The forward and backward passes should be clearly shown on the diagram. Each activity should be described using the notation shown in class as follows:

Task D

A small hotel with 8 rooms is located in central London. Based on records over the last 5 years, it was estimated that the probability a room is occupied on any particular “weekend” night (Saturday and Sunday) is 0.7. This is the probability of success.

On any particular “weekend” night, a hotel is only occupied (Success) or not occupied (Failure). There are no other possibilities.

1. What is the probability that FOUR or more rooms are occupied on any particular weekend night? Show all your calculations using a well laid-out Excel spreadsheet table.

The occupancy rate on any particular night during a week-day (Monday to Friday) is assumed to be 50%, i.e. a room has a probability of 0.5 to be occupied during any week-day.

On the first Monday in January, 2 out of the 8 rooms were occupied.

2. What is the p-value? You need to show the table of values for your calculations

Give your answers correct to 3 decimal places.

(5/5)
Attachments:

Related Questions

. The fundamental operations of create, read, update, and delete (CRUD) in either Python or Java

CS 340 Milestone One Guidelines and Rubric  Overview: For this assignment, you will implement the fundamental operations of create, read, update,

. Develop a program to emulate a purchase transaction at a retail store. ThisΒ  program will have two classes, a LineItem class and a Transaction class

Retail Transaction Programming Project  Project Requirements:  Develop a program to emulate a purchase transaction at a retail store. This

. The following program contains five errors. Identify the errors and fix them

7COM1028   Secure Systems Programming   Referral Coursework: Secure

. Accepts the following from a user: Item Name Item Quantity Item Price Allows the user to create a file to store the sales receipt contents

Create a GUI program that:Accepts the following from a user:Item NameItem QuantityItem PriceAllows the user to create a file to store the sales receip

. The final project will encompass developing a web service using a software stack and implementing an industry-standard interface. Regardless of whether you choose to pursue application development goals as a pure developer or as a software engineer

CS 340 Final Project Guidelines and Rubric  Overview The final project will encompass developing a web service using a software stack and impleme