logo Hurry, Grab up to 30% discount on the entire course
Order Now logo

Ask This Question To Be Solved By Our ExpertsGet A+ Grade Solution Guaranteed

expert
Umar AbdullaEconomics
(3/5)

627 Answers

Hire Me
expert
Quality ExpertBusiness
(5/5)

861 Answers

Hire Me
expert
Elizabeth BachStatistics
(5/5)

905 Answers

Hire Me
expert
Wil AndersonEngineering
(5/5)

783 Answers

Hire Me
Computer Network

This project includes three phases. You need to complete Phase I before moving on to Phase II. Likewise, you need to complete Phase II before moving on to Phase III or the final phase in the project.

INSTRUCTIONS TO CANDIDATES
ANSWER ALL QUESTIONS

NETW204 Class Project

This project includes three phases. You need to complete Phase I before moving on to Phase II. Likewise, you need to complete Phase II before moving on to Phase III or the final phase in the project.

Hi-tech Net Corp. is operating in three locations in the United States. Their main office is located in New York, NY. They have two branch offices located in Chicago, IL and Sacramento, CA.

You have just been hired as Hi-tech Net Corp.’s consulting engineer to implement their network infrastructure. Both branch offices will be directly connected to the main office in NY via a leased line circuit (point-to-point serial connection).

New York’s Office IP Information

The main office has four LAN segments: Executive, Engineering, Services, and Native&Management. Each LAN segment is identified by a VLAN number as seen below. For example:

  • Executive: VLAN 15
  • Engineering: VLAN 25
  • Services: VLAN 35
  • Native&Management: VLAN 99

The organization is using the following network address in NY: 10.150.0.0/16.

  • Executive: 60 computers only including future growth in this number
  • Engineering: 80 computers only including future growth in this number
  • Services: 115 computers including future growth in this number
  • Native&Management: 12 computers including future growth in this number

*** Future growth means that we already take growth into consideration. Do not try to estimate or add more IP addresses than necessary to avoid getting an incorrect subnet.

Illinois’ Office IP Information
The IL branch has three LAN subnets with 45 IP addresses on each subnet. They use the following network address to obtain the required IL subnets: 10.150.100.0 /24.

California’s Office IP Information
The CA branch has three LAN subnets with 25 IP addresses on each subnet. They use the following network address to obtain the required CA subnets: 10.150.200.0 /25.

PHASE I (20 points total)—Due Week 3

Tasks to Do.

Task 1: Subnet the 10.150.0.0/16 network for NY and assign the first subnets to Services followed by Engineering. You may need to re-subnet for Executive and Native&Management subnets to avoid wasting IP addresses. Ensure that you re-subnet only the first unused subnet and nothing else. Assign the subnets to Executive and Native&Management. (5 points)

New York Office IP

IP Address Range

New Subnet Mask

New Network Address

VLAN 15-Executive

 

 

 

VLAN 25-Engineering

 

 

 

VLAN 35-Services

 

 

 

VLAN 99-Native&Management

 

 

 

 

Task 2: Subnet the 10.150.100.0 /25 network for IL and assign the last IP address on the three subnets to the Loopback 1, Loopback 2, and Loopback 3 interfaces of the router. We will use a loopback or virtual interface to simulate the LAN subnets. This will speed up configuration and allows us to create our topology without rewiring. (3 points)

Illinois Branch IP

IP Address Range

New Subnet Mask

New Network Address

Loopback 1

 

 

 

Loopback 2

 

 

 

Loopback 3

 

 

 

 

Task 3: Subnet the 10.150.200.0 /25 network for CA and assign the last IP address on the three subnets to the Loopback 1, Loopback 2, and Loopback 3 interfaces of the router. We will use a loopback or virtual interface to simulate the LAN subnets. This will speed up configuration and allows us to create our topology without rewiring. (3 points)

California Branch IP

IP Address Range

New Subnet Mask

New Network Address

Loopback 1

 

 

 

Loopback 2

 

 

 

Loopback 3

 

 

 

 

Task 4: Use the following network address (10.1.255.0/25) to find the WAN subnets between NY and IL and NY and CA respectively. Note that there should only be two IP addresses per subnet for each WAN link. Assign the first WAN subnet to NY to IL and the second WAN subnet to NY to CA. (2 points)

WAN Subnets

IP Address Range

New Subnet Mask

New Network Address

NY to IL

 

 

 

NY to CA

 

 

 

 

Task 5: Use Microsoft Visio to design the current network topology. Remember to use Loopback interfaces for the subnets in NY, IL, and CA. Use point-to-point interfaces to connect the remote branch offices to NY. See the sample network diagram below. Replace the phrase “IP Address” by the correct IP address for each interface on the routers. Include the WAN IP addresses on the diagram as well. (7 points)

Related Questions

. The fundamental operations of create, read, update, and delete (CRUD) in either Python or Java

CS 340 Milestone One Guidelines and Rubric  Overview: For this assignment, you will implement the fundamental operations of create, read, update,

. Develop a program to emulate a purchase transaction at a retail store. This  program will have two classes, a LineItem class and a Transaction class

Retail Transaction Programming Project  Project Requirements:  Develop a program to emulate a purchase transaction at a retail store. This

. The following program contains five errors. Identify the errors and fix them

7COM1028   Secure Systems Programming   Referral Coursework: Secure

. Accepts the following from a user: Item Name Item Quantity Item Price Allows the user to create a file to store the sales receipt contents

Create a GUI program that:Accepts the following from a user:Item NameItem QuantityItem PriceAllows the user to create a file to store the sales receip

. The final project will encompass developing a web service using a software stack and implementing an industry-standard interface. Regardless of whether you choose to pursue application development goals as a pure developer or as a software engineer

CS 340 Final Project Guidelines and Rubric  Overview The final project will encompass developing a web service using a software stack and impleme