logo Hurry, Grab up to 30% discount on the entire course
Order Now logo
1812 Times Downloaded

Ask This Question To Be Solved By Our ExpertsGet A+ Grade Solution Guaranteed

expert
Dick BentleyEnglish
(5/5)

630 Answers

Hire Me
expert
Allen CrumppTechnical writing
(5/5)

731 Answers

Hire Me
expert
Puneet GuptaStatistics
(/5)

501 Answers

Hire Me
expert
Aidan CampbellTechnical writing
(5/5)

813 Answers

Hire Me
Quantitative Methods
(5/5)

system for printer manufacturing consists of a number of factories, warehouses, distribution centers, and customers

INSTRUCTIONS TO CANDIDATES
ANSWER ALL QUESTIONS

A system for printer manufacturing consists of a number of factories, warehouses, distribution centers, and customers as shown in Figure 1.

 

Printers Type “Laser Jet Pro” are fabricated in two (2) factories located at different cities. The printers are then shipped to two (2) warehouses at which they then shipped to three (3) distribution centers. At the distribution centers, printers are subjected to a very strict quality inspection process. Any printers do not meet quality standards will be returned directly to the factories to be reworked (repaired). The printers passed the inspection test are transported to ten (6) customers to satisfy their needs. From historical data, the rate of rework is (2% of the printers inspected at distribution centers). The unit transportation cost between ant two nodes in the network is estimated to be SR

5.Figure 1: Printer manufacturing and distribution network 

The two factories have production capacities and production costs listed in the following table.

Factory

F1

F2

Daily Production Capacity (printers)

950

800

Production cost(SR/printer)

100

95

Rework cost(SR/printer)

10

10

The warehouses have limited space (volume shown in the table below). Each printer has the following dimensions (50 cm length, 40 cm wide, and 20 cm height).

Warehouse

W1

W2

Volume (m^3)

400

350

 Customer daily demands need to be satisfied without any shortage (table below). 

Customers

C1

C2

C3

C4

C5

C6

Daily

demand

120

180

144

150

175

200

 

·         Develop a mathematical model (in general form) to help the company determine the number of printers to produce in each factory, flow between each two nodes, number of printers returned per day while minimizing the total cost including (production cost, rework cost, and transportation cost).

·         Find the optimal solution using software

·         Conduct sensitivity analysis to study the impact of rate of rework (1%, 2%, 5%, 10%, 15%, 20%) on the model performance and number of produced printers per day.

·         The manager of warehouse W1 wants to find a low cost inventory policy for printers. The manager identifies two types of variables, controllable and uncontrollable inputs. The controllable inputs are the order quantity and reorder points. The uncontrollable inputs are daily demand and variable lead time. Based on historical data, the demand data for the printers and lead times are shown in Tables below:

Daily      Demand      For

printers

Frequency (Days)

0

10

1

20

2

40

3

60

4

40

5

30

 

Lead Time (Days)

Frequency (Orders)

1

10

2

25

3

15

 

The first policy that the manager wants to test is an order quantity of 20 printers with a reorder point of 5 printers. Conduct the simulation for a 20 day period? Use excel. The warehouse is open 200 days a year. Estimated ordering cost is SR30 per order. Holding cost is SR 22 per drill per year. Lost sales cost SR 25. Find total daily cost.

·         Re-simulate using different values of an order quantity of (35 printers) and reorder point of (4 printers). Compare costs of the two policies. Based on the obtained cost which policy you would recommend.

(5/5)
Attachments:

Expert's Answer

1812 Times Downloaded

Related Questions

. The fundamental operations of create, read, update, and delete (CRUD) in either Python or Java

CS 340 Milestone One Guidelines and Rubric  Overview: For this assignment, you will implement the fundamental operations of create, read, update,

. Develop a program to emulate a purchase transaction at a retail store. This  program will have two classes, a LineItem class and a Transaction class

Retail Transaction Programming Project  Project Requirements:  Develop a program to emulate a purchase transaction at a retail store. This

. The following program contains five errors. Identify the errors and fix them

7COM1028   Secure Systems Programming   Referral Coursework: Secure

. Accepts the following from a user: Item Name Item Quantity Item Price Allows the user to create a file to store the sales receipt contents

Create a GUI program that:Accepts the following from a user:Item NameItem QuantityItem PriceAllows the user to create a file to store the sales receip

. The final project will encompass developing a web service using a software stack and implementing an industry-standard interface. Regardless of whether you choose to pursue application development goals as a pure developer or as a software engineer

CS 340 Final Project Guidelines and Rubric  Overview The final project will encompass developing a web service using a software stack and impleme