The estimator has to price for the following two items of work that are to be built into the tender price:
(i) Handrails to the perimeter of 150m of the roof for the 10 weeks period that workers will be required to work on the roof in an exposed manner.
(ii) Earthwork support to the excavation faces of 3,000m² of very deep basement excavations, 1,000m² of trench excavation of various depths and 500m² of shallow trenches for concrete kerb footings.
The estimator has made notes on how rates are to be priced, calculated some rates, and obtained a subcontract quotation which are discussed below:
A scaffold subcontract quotation has been obtained for providing the 150m of handrails to the roof for 5 weeks amounting to £7,500.00. The quote includes an extra hire period rate of £300.00 per week if the roof handrail is to be on-site longer than the 5 weeks period.
The estimator has calculated rates for providing earthwork support if required to:
The estimator’s notes record the scaffold quote needs 5 - 10% adding because its fixed price term expires before the project commences.
The estimator’s notes record there is a belief that Bumpy Construction Ltd will be the lowest tender if the price does not include for providing all the excavations with earthwork support and that there is an additional competitive advantage that can be taken if Bumpy Construction Ltd does not price the roof handrail for the full 10 week period.
The estimator’s notes also make reference to what the ground report states about the ground conditions and the discussions that have been had with managers as to how to build this project and construct the roof work in a safe manner.
The estimator notes record that all the rates discussed above should have added 10 – 20% for overheads, profit & general attendance.
Ensure your answer to this part of the question makes reference to:
Standard forms of construction contracts such as the JCT and the NEC suite of contracts contain provisions in respect of time to complete the construction works.
(8 Marks)
(b) Ensure your answer makes a brief reference to contract law and considers the following matters:
(i) The notices that are required to be issued by the main contractor to request grants of extension of time and recover additional prolongations costs caused by the delays.
(ii) The certification of practical completion.
(iii) The original contract period.
(iv) The delay period beyond the contract original completion date.
(v) The amount of liquidated damages that the employer may be able to claim from the main contractor.
(vi) The amount of prolongation costs that the main contractor may be able to claim from the employer.
One risk that did not register high as a priority at initial concept stage was the risk associated with the existing fabric of the building. The overall scheme eventually became a construction contract comprised of retaining 50% of the existing building unaltered and refurbishing the balance of the existing building, to which a new build extension was the attached. Initially an overall budget of £6,000,000 was decided upon.
Standard forms of construction contracts such as the JCT and the NEC suite of contracts contain provisions in respect of time to complete the construction works.
Discuss the risk associated with the asbestos in the fabric building from a health and safety, financial and time perspective.
(b) Stage 7 in use
The facilities management contractor has a survey of the existing building that identifies a minimal amount of asbestos exists in the building which they have used to operate and manage the building over many years
(c) Stage 2 Develop Design
The facilities management contractor provides the workshop team with their survey of asbestos identified in the existing building.
(d) Stage 5 Construction Stage
The existing survey undertaken before the works have
commenced was found to have failed to identify
massive amounts of asbestos that exist in concealed
areas that the proposed work will disturb.
(b) Describe and discuss how you would use this program to enhance your ability to manage the erection of this single house.
Ensure your answer to this question discusses the following matters:
(Total 25 Marks)
CS 340 Milestone One Guidelines and Rubric Overview: For this assignment, you will implement the fundamental operations of create, read, update,
Retail Transaction Programming Project Project Requirements: Develop a program to emulate a purchase transaction at a retail store. This
7COM1028 Secure Systems Programming Referral Coursework: Secure
Create a GUI program that:Accepts the following from a user:Item NameItem QuantityItem PriceAllows the user to create a file to store the sales receip
CS 340 Final Project Guidelines and Rubric Overview The final project will encompass developing a web service using a software stack and impleme